For investors

A building you can still change

We are developing one business park: 7,000 m² in Marijampolė, on Via Baltica and half an hour from the Polish border. It is a base inside the European Union for Nordic manufacturers, distributors and investors. Lettable area is set to requirement and fitted out to your drawing.

We reply within one working day, in English or Lithuanian.

park area on one site
7k m²
buildings: production, retail, warehousing
3
access and security
24/7
from signature to handover
18mo

Reach

Travel time from the Marijampolė park

Polish border
30min
Kaunas
45min
Kaunas airport
50min
Port of Klaipėda
2h 45 min
Warsaw
5h
Riga
4h 30 min

What we take on

From enquiry to first shift

Enquiry and viewing

You tell us the process, area, power and timing. We walk the site and go through the drawings with your dimensions.

1 week

Layout and offer

Unit layout, rent and scope of fit-out. If no existing unit fits, we design one to requirement.

1-2 weeks

Permits and approvals

The council, utility operators and inspection bodies sit on our side of the table, not yours.

in parallel

Lease

Area, rent, scope of works and handover date are fixed.

2-3 weeks

Construction, fit-out and handover

We build, then fit partitions, power, gates and floor finish. Handed over with a record and measurement reports.

about 18 mo

Why Lithuania

What it means in practice

EU and the euro

No customs, no currency risk and no separate certification when trading inside the EU. The euro was adopted in 2015.

Costs

Construction and running costs below Nordic levels, and in Marijampolė below Vilnius and Kaunas too. The build standard is the same: energy class A.

Labour

The Suvalkija region already runs manufacturing and metalworking plants, so engineering and production skills are here rather than an hour away; English in business is the norm.

Time zone

The same working day as Stockholm and Copenhagen: decisions happen that morning, not the next day.

Common questions

What people ask before signing

Yes. The lease can be signed by the parent company and later assigned to the newly incorporated entity. Registration in Lithuania usually takes a few working days.

From three years. On longer terms part of the fit-out is included in the rent, so the upfront investment is lower and the monthly cost is predictable.

Yes, and right now it is cheapest: design is still under way. Gate positions, power distribution, floor loading and unit boundaries are all agreed before construction. From signature to handover is about eighteen months.

We are. The council, utility operators and inspection bodies are handled on our side, so you receive premises with valid documentation.

Contact

Who will reply

Your contact

Name Surname

Head of leasing

What the reply contains

  • An outline layout against your dimensions
  • An area and rent proposal
  • The scope and duration of fit-out works
  • A viewing time that suits your team

Let us plan your space

Tell us the process, the area and the power you need. We come back with an outline layout drawn to your dimensions, the gate and power arrangement and a timescale, and if you would rather see it on the ground, we arrange a site visit the same week.

Arrange a viewing

We reply within one working day. This is a demonstration build: the form sends nothing.

Thank you. Your request has been noted. We will be in touch within one working day.